What We Do

ERRCS inspections, done thoroughly.

Every Link 1 Telecom inspection covers the full scope required by NFPA 1221 and the California Fire Code — testing, documentation, and follow-through.

L1T Testing — ERRCS/BDA Annual Inspections & Grid Testing
01

Full Annual ERRCS Inspection & Testing

The core service property managers need every year. Our certified technicians conduct a full on-site inspection of your emergency responder radio system from end to end. Everything documented, everything signed off.

  • Grid-by-grid signal strength testing per NFPA 1221 (95% / 90% coverage standards)
  • Battery backup load testing — 12 or 24 hour, depending on your AHJ's requirement
  • Bi-directional amplifier (BDA) inspection and performance check
  • Donor antenna alignment and signal verification
  • Distributed antenna network walkthrough and visual inspection
  • Alarm and supervisory signal testing to your fire alarm panel
  • Complete photo documentation of equipment, labels, and panel readouts
02

AHJ-Ready Documentation

The inspection is only half the job. The other half is making sure the fire marshal accepts your report on the first submission. We format every report to match what your local AHJ expects to see — no back-and-forth, no resubmissions.

  • Complete written compliance report delivered within 5 business days
  • Signal coverage maps with grid square pass/fail results
  • Battery test logs with voltage readings and load specifications
  • Equipment serial numbers, firmware versions, and inspection photos
  • Signed by certified technician with FCC GROL credentials
  • Direct submission to your AHJ on request
03

Independent RF Verification & Installer Report Validation

When a building owner, property manager, or AHJ needs an unbiased second opinion on an ERRCS system, we provide fully independent testing with zero affiliation to the installer. Our findings stand on their own.

  • Independent grid testing with no installer present
  • Side-by-side comparison of installer-reported vs. measured results
  • Pre-test outdoor baseline measurement confirming donor network is live
  • Uplink and downlink tested independently
  • Discrepancy log submitted directly to AHJ if requested
  • Signed report with full conflict-of-interest disclosure
04

Multi-Property Portfolio Management

If you manage more than one building, juggling annual deadlines across a portfolio is a part-time job by itself. We take that off your plate. One point of contact, one tracker, one combined invoice.

  • Centralized due-date tracking for your entire portfolio
  • 60-day advance reminders so nothing falls through the cracks
  • Coordinated scheduling that minimizes tenant disruption
  • Single combined invoice or per-property billing — your choice
  • Dedicated account contact who knows your buildings
  • Volume pricing for portfolios of 5 or more properties

Ready to schedule an inspection?

Tell us about your property or portfolio and we'll get back to you with a quote within one business day.

Get a Quote →